Retour à la liste
Take off and landing the Zeppelin

Take off and landing the Zeppelin

18 149 5

Pfriemer


Premium (World), Bangkok

Take off and landing the Zeppelin

Only 3 ground crew are necessary to bring the Zeppelin in the right landing or starting position. Therefore the personel costs are lower and the turn-around times are minimal. For the start, the nose is uncoupled from the mast truck. For landing, the airship is manoeuvered into the desired position. For masting, the noseline is coupled with the mast line, winched in and hydraulically locked on the mast.

Commentaire 5